Licence 289824CIn-house Level 2 capabilityCall 0466 125 125

Service Area: Hills District

Hills District Granny
Flat Metering.

Granny flat electrical separation and metering assessment for the Hills District. We review the current supply, switchboard and meter enclosure to identify what may be needed for a proposed separate smart meter.

Local Network Compliance

Metering tailored
to your area.

The network distributor for the Hills District varies by exact property and must be confirmed. It can include the Endeavour Energy network, though some borders may include Ausgrid. We prepare your electrical setup to their specific rules. Network requirements and scope should be confirmed for the specific property before work commences.

01

Switchboard upgrades

We ensure your existing board meets current AS/NZS 3000 safety standards and provides sufficient space for the new metering arrangement.

02

Consumer mains

If the existing supply appears insufficient for the proposed load, consumer mains or supply work may form part of the assessed scope. In-house Level 2 ASP capability for applicable granny-flat and supply-upgrade works is considered where the work, site conditions and applicable authorisations allow.

03

Smart meter preparation

We complete all electrical site preparation so your retailer's chosen metering provider can install the new separate meter without delays.

Get your project moving in Hills District

Tell us what is
stopping the job.

Need to know if your current setup can handle a separate meter? Send us an enquiry and we can review the requirements.

0466 125 125 Licence 289824C

This form sends your details by email and cannot accept photo uploads. To include meter-box photos, please call or SMS them separately to 0466 125 125. We collect the details needed to assess your enquiry, alongside your IP address for security. Data is processed securely via Resend. View our Privacy Policy.