Overhead limits
The existing overhead service line may be too small for the combined maximum demand.
In-house Level 2
Complex metering can involve supply-side work. In-house Level 2 ASP capability for applicable granny-flat and supply-upgrade works helps us assess and coordinate the relevant scope, subject to site, authorisations and network requirements.
The supply barrier
Standard electrical contractors cannot work on network-related assets. When a granny flat requires a larger incoming supply from the street, the project halts until the required Level 2 scope is managed.
The existing overhead service line may be too small for the combined maximum demand.
The network connection point on your fascia or private pole may need upgrading to meet current standards.
An inspector may have flagged existing non-compliant supply arrangements that must be fixed.
The advantage of one team
In-house Level 2 ASP capability for applicable granny-flat and supply-upgrade works lets us consider the supply and metering scope together, where the authorisations and site requirements allow. We prepare the electrical work and metering board while the final connection pathway remains subject to network requirements.
Evaluating the existing incoming supply against the new maximum demand of the dual occupancy.
Coordinating the replacement of undersized consumer mains to safely support two dwellings.
Facilitating necessary upgrades to the property's connection point to meet current standards.
Preparing the site and switchboard for your retailer's appointed metering provider.
Get your project moving
If your builder or regular electrician has advised you need Level 2 works, contact us. We can review the site and assess the supply scope.
0466 125 125 Licence 289824C